Akiya Okayama
3D Okayama Akiya Map & AI Assistant
Standard Feed

Kibichuo Town Municipal Home No.104 — ¥4M (6DK)

Kibichuo Town, Okayama Prefecture (No.104)

Official Municipal Source ↗View House on 3D Map →
Official Gallery: 2 Photos · Includes FloorplanClick any photo or floorplan to open full size
Official Municipal Photo #1
Official Municipal Photo #1
Official Interior Photos & Floorplan Sheet (Kibichuo Municipal PDF)
Official Interior Photos & Floorplan Sheet (Kibichuo Municipal PDF)Floorplan

Verified Property Specifications

Sale Price
¥4M
¥4,000,000
Land / Building
649.51m²
180.85m² (6DK)
Built / Seismic
1978
Pre-1981 Kyu-Taishin
Elevation (GSI)
185 m
34.8700, 133.7724
Water
Municipal water
Sewage
Vault toilet (Kumitori)
Parking
3 cars on-site
Repair Notes
Verify repair needs on site
Lifelines (Drive)
Grocery 11 min · Hospital 14 min · JR Station 26 min · Shinkansen 42 min
Deterministic Data-Driven Evaluation

Okayama Buy & Fit Score: 80/100 — Solid Potential

80
Value vs. Okayama Median24 / 25

¥6,158/m² land vs Okayama median ¥14,500/m²

Daily Convenience16 / 25

Avg 17 min drive to core lifelines

Move-In & Structure15 / 25

Pre-1981 Kyu-Taishin · Verify repair needs on site

Land & Lifestyle Fit25 / 25

649m² lot · 3 cars on-site

Original Analytical Review · Writer & Critic Audited

Pricing Reality, Structure, Lifelines & Buyer Fit

Critic Audit: 95/100 · 3% Overlap

1. Value & Pricing Verdict

Listed by Kibichuo Town at ¥4M, No.104's 649.5m² plot averages ¥6,158/m² (58% below prefectural median; 80/100 Solid Potential).

2. Layout & Livability Reality

Backed by 2 gallery photos + floorplan, this 6DK house (180.8m² floor, built 1978 (Pre-1981 Kyu-Taishin)) runs public water and kumitori vault drainage (3-car parking; Verify repair needs on site).

3. Elevation & Daily Convenience

Terrain sits 185m high (200m–450m inland uplands); drive ~11 min to groceries, ~14 min to hospital, ~26 min to trains (~42m bullet train).

4. Best-Fit Buyer Profile & Due Diligence

Appeals to remote workers or DIYers willing to verify long gravel driveways on site and apply for highland settlement subsidies. Factor modern septic installation early.